Archive by Author

Grace Hospital

Project:                Grace Hospital Location:              Tauranga Client:                   Foster Construction Weight:                 35 ton Key Personnel:  Project Manager, Grier Fuller Type:                    Qualified welders and weld procedures for welding as per AS/NZS 2980, AS/NZS 1554.1 and AS/NZS 1554.3: in accordance with the Project Plan and Specification requirements.  Steel Fabrication Certification to Construction Category 3. H&S:                     Site Safe SiteWise […]

Comments Off on Grace Hospital Continue Reading →

Pacific Coast Village Retirement Village

Project:                Pacific Coast Village Retirement Village Location:              Papamoa, Tauranga Client:                   C3 Construction Weight:                 195 ton Key Personnel:  Project Manager, Elliott Fuller Type:                    Qualified welders and weld procedures for welding as per AS/NZS 2980:2007, AS/NZS 1554.1:2004 and AS/NZS 1554.3:2008 in accordance with the Project Plan and Specification requirements.  Steel Fabrication Certification to Construction Category 3. […]

Comments Off on Pacific Coast Village Retirement Village Continue Reading →

Bay Oval Scoreboard

The Bay Oval, situated on Blake Park, Mount Maunganui, is the premier cricket ground of the Bay of Plenty Region.   Set against the backdrop of Mount Mauao, the Bay Oval is an internationally sized, purpose built ground.  It boasts 70 m boundaries, enclosed by a white picket fence, surrounded by grass embankments with seating for […]

Comments Off on Bay Oval Scoreboard Continue Reading →

LDS Church, Guam

Steelworks NZ Ltd were contracted by Lockwood to provide steel work for the LDS Church project in Guam, a small island nation in the Pacific Ocean. This was a 4.37 ton steel project, and had to comply with the Pacific Island’s building standards as the site is very near the sea and is subject to salt […]

Comments Off on LDS Church, Guam Continue Reading →

Kaikoura Seawall Moulds

Comments Off on Kaikoura Seawall Moulds Continue Reading →

Te Aroha Events Centre

Te Aroha Events Centre is a 100 tonne project Steelworks NZ Ltd completed for the Matamata District Council. The building is expected to be completed in late 2016. Click here to view time-lapse of the building. The centre will provide a sports hall with 2 full size netball/basketball courts and space for up to 8 […]

Comments Off on Te Aroha Events Centre Continue Reading →

Rocket Slide takes off at Memorial Slide!

Rocket Slide takes off at Memorial Slide!

Rocket Slide launches at Memorial Park Steelworks NZ Ltd commissioned by Tauranga City Council to make Rocket Slide for Memorial Park in Tauranga.

Comments Off on Rocket Slide takes off at Memorial Slide! Continue Reading →

Tauranga Airport Extension

steelwork, fabrication, installation, structural steel

Steelworks New Zealand Ltd fabricated and installed steelwork for the baggage extension and cover way at Tauranga Airport.

Comments Off on Tauranga Airport Extension Continue Reading →

Workshop

Comments Off on Workshop Continue Reading →

Tauranga Eastern Link

Tauranga Eastern Link – welding bridge piles.

Comments Off on Tauranga Eastern Link Continue Reading →